-
BASE
subnavigation
BASE
- About us
- Laboratorium
- Career
- Laws and regulations
- Legal Basis
- Manual on Reactor Safety and Radiation Protection
- 1A Nuclear and radiation protection law
- 1B Other laws
- 1C Transport law
- 1D Bilateral agreements
- 1E Multilateral agreements
- 1F EU law
- 2 General administrative provisions
- 3 Announcements of the BMU and the formerly competent BMI
- 4 Relevant provisions and recommendations
- 5 Nuclear Safety Standards Commission (KTA)
- 6 Key committees
- Annex to the NS Handbook
- A 1 English translations of laws and regulations
- Dose coefficients to calculate radiation exposure
- BASE topics in the Bundestag
- Nuclear safety
- Nuclear waste management
-
Topics
subnavigation
Topics
Nuclear Safety
Interim Storage / Transport
-
News
subnavigation
Nuclear Safety
Among others, the German Bundestag dealt with topics affecting the tasks of tthe tasks of the Federal Office for the Safety of Nuclear Waste Management (BfE). In the following you will find links relating to the Parliamentary Material Information System (DIP) of the German Bundestag.
The compilation includes answers to parliamentary inquiries on the topic of nuclear waste management which have been answered by the federal government on the basis of contributions made by the BfE or, respectively, whose topics are among the tasks of the BfE (documents in German only).
Date | Topic | Document number |
---|---|---|
2017- | ||
13 January 2017 | Radiological effects on the failure of the reactor pressure vessel at the Belgian nuclear power plant Tihange 2 | 18/10830 |
2016- | ||
27 June 2016 | Possible accident scenarios in pressurised-water reactors as a result of a leak in a heating-pipe of a steam-generator | 18/8979 |
29 March 2016 | 30 years Chernobyl - Damage to the Federal Republic of Germany | 18/7996 |
21. March 2016 | 30 years Chernobyl – Current situation in the Ukraine | 18/7937 |
29. February | Latest developments in Fukushima and other Japanese nuclear sites | 18/7739 |
11 January 2016 | Detection of cracks in the Belgian nuclear power plants Doel 3 and Tihange 2 and lifetime extension of Doel 1 and Doel 2 | 18/7220 |
2015- | ||
27 June 2016 | Research reactor Munich II | 18/7133 |
15 September 2016 | Conical jet tube at the Berlin research reactor BER II | 18/6001 |
19 August 2016 | Defects in the Swiss Beznau Nuclear Power Plant | 18/5792 |
7 July 2015 | Questions on separation of unite in the nuclear power plants Gundremmingen B and C (request to the federal government's reply to the minor interpellation to Bundestagsdrucksache 18/4888) | 18/5483 |
12 May 2015 | Nuclear fuel removed and dismantling of the nuclear power plants finally shut down in 2011 and of the Grafenrheinfeld nuclear power plant | 18/4887 |
9 April 2015 | 29 years of Chernobyl – Current situation in the Ukraine | 18/4576 |
27 March 2015 | Adaptation of disaster control for the Berlin Research Reactor BER II according to the German Commission on Radiological Protection | 18/4497 |
12 March 2015 | Nuclear research reactor Berlin BER II - High field magnet of Helmholtz-Zentrum Berlin | 18/4309 |
12 March 2015 | Decommissioning and dismantling of the Isar 1/Ohu nuclear power plant and handling of high-level radioactive fuel elements | 18/4291 |
29 January 2015 | Retrofit measures at nuclear power plants Gundremmingen B and C | 18/3875 |
2014- | ||
18 December 2014 | European nuclear projects | 18/3606 |
16 December 2014 | Revision of the Euratom Treaty | 18/3539 |
12 December 2014 | New questions relating to the safety of nuclear installations in Ukraine | 18/3521 |
26 September 2014 | Transients in German nuclear power plants | 18/2675 |
26 September 2014 | Ukraine conflict and threat and security situation of local nuclear power plants and nuclear repositories | 18/2670 |
8 September 2014 | Operational interruption at the Berlin BER II research reactor (enquiry to the government's answer to a parliamentary question concerning Bundestagsdrucksache 18/1784 - see below) | 18/2507 |
29 August 2014 | Status of nuclear power plants finally shut down in 2011 in terms of being free from nuclear fuel and dismantling | 18/2427 |
18 August 2014 | Conversion of uranium hexafluoride from the Gronau uranium enrichment plant owned by the URENCO company to uranium oxyde in France and the UK | 18/2362 |
14 July 2014 | Safety of nuclear installations in Ukraine | 18/2109 |
14 July 2014 | Precursor analyses of incidents in German nuclear power plants | 18/2108 |
26 June 2014 | Promotion and research in the field of uranium enrichment in Germany | 18/1910 |
13 June 2014 | Research at the Berlin Reaktor BER II | 18/1764 |
14 May 2014 | Design characteristics and risks of European nuclear power plants | 18/1412 |
12 May 2014 | AREVA Nuclear Professional School at the Karlsruhe Institute of Technology | 18/1396 |
07 May 2014 | Position of the federal government on the Tihange and Doel nuclear power plants situated close to the German border | 18/1347 |
29 April 2014 | Future of the uranium enrichment plant in Gronau and the URENCO uranium enrichment company | 18/1267 |
25 April 2014 | Current developments in Chernobyl and other nuclear sites in Ukraine | 18/1242 |
22 April 2014 | Activities of the Jülich Research Center related to high-temperature reactor technology | 18/1268 |
10 March 2014 | Gundremmingen nuclear power plant | 18/741 |
27 February 2014 | Nuclear projects in Europe | 18/677 |
26 February 2014 | Grants for associations of the pro-nuclear lobby | 18/668 |
5 February 2014 | Court proceedings in the field of nuclear power | 18/442 |
2013- | ||
1 August 2013 | Characteristics of the emergency cooling system in the Gundremmingen nuclear power plant units B and C (queries relating to the the federal government's reply to the parliamentary enquiry regarding Bundestagsdrucksache 17/14454 see below) | 17/14606 |
30 July 2013 | Characteristics of the emergency core cooling system in the Gundremmingen nuclear power plant Units B and C (Queries concerning the federal government's answer to the interpellation to Bundestag document No. 17/14340; cf. below) | 17/14454 |
5 July 2013 | Characteristics of the emergency core cooling system in the Gundremmingen nuclear power plant Units B and C | 17/14340 |
2 May 2013 | System failures at the Gundremmingen nuclear power plant | 17/13364 |
26 April 2013 | Atomic research at the Karlsruhe Institute of Technology | 17/13342 |
27 March 2013 | Handling of depleted uranium from URENCO and from the uranium enrichment plant in Gronau | 17/12943 |
19 February 2013 | Sale of URENCO | 17/12364 |
23 January 2013 | Nuclear liability in Europe | 17/12156 |
17 January 2013 | Gender-specific burdens and risks due to nuclear power plants in the Federal Republic of Germany | 17/12107 |
2012- | ||
19 December 2012 | Questions on nuclear regulations and on possible security deficits in the Gundremmingen nuclear power plant | 17/11947 |
19 December 2012 | Dismantling of nuclear power plants – current state and market situation | 17/11944 |
5 December 2012 | Risks associated with the nuclear power plant to be constructed in Belarus | 17/11779 |
29 November 2012 | Planned operational life span extension of nuclear power plants Tihange 1 (Belgium) and Borssele (Netherlands) | 17/11760 |
9 November 2012 | Costs for the dismantling of the AVR reactor Jülich | 17/11447 |
7 November 2012 | Europe-wide relevance of cracks found in Belgian nuclear power plants | 17/11348 |
23 August 2012 | Questions on the Temelin 3 and 4 nuclear power plant project, on the existing Temelin 1 NPP and queries concerning Bundestag document No. 17/10269 | 17/10519 |
19 July 2012 | Potential threat posed by the French nuclear power plant Cattenom and results of the stress test | 17/10341 |
6 July 2012 | Questions on the status of the Temelin 3 and 4 NPP project, the respective public participation procedure and queries concerning the federal government's reply to the parliamentary question concerning Bundestag document No. 17/9832 | 17/10269 |
12 June 2012 | EU stress tests concerning threats of terrorist attacks on nuclear facilities | 17/9906 |
7 June 2012 | Incidents in German nuclear power plants concerning works in power operation | 17/9885 |
30 May 2012 | Transboundary public participation regarding the construction of nuclear facilities in neighbouring states | 17/9832 |
27 April 2012 | Causes of deformation of fuel elements in German pressurised water reactors (Protocol item 54.) | 17/9449 |
20 March 2012 | Stress test of the research reactor in Berlin | 17/9019 |
1 March 2012 | European Union stress test for the French nuclear power plant Cattenom (close to the border with Germany and Luxembourg) - preliminary result | 17/8817 |
31 January 2012 | State of the reprocessing of German fuel elements abroad and the German plutonium inventory | 17/8527 |
31 January 2012 | Decommissioning and dismantling of nuclear power plants and radioactive waste management - questions as to who will bear the costs and the utilities' provisions for liabilities and charges (enquiry relating to the federal government's reply, document number 17/7777, see below) | 17/8526 |
23 January 2012 | Safety of the Grohnde nuclear power plant | 17/8436 |
2011- | ||
12.12.2011 | Klinische und logistische Kapazitäten für atomaren Unfall in Deutschland | 17/8113 |
23 November 2011 | Decommissioning and dismantling of nuclear power plants and radioactive waste management - questions as to who will bear the costs and the utilities' provisions for liabilities and charges | 17/7777 |
3 November 2011 | Rheinsberg nuclear power plant - decommissioning and nuclear waste | 17/7607 |
31.10.2011 | Länderausschuss Atomkernenergie | 17/7568 |
15 August 2011 | Research reactor BER-II - Supplement to answer number 17/6693 (see below) | 17/6803 |
12 August 2011 | Reportable events during re-startup in nuclear power plants still in operation (pages 71 and the following) | 17/6790 |
3 August 2011 | Information notices for nuclear power plants | 17/6731 |
29 July 2011 | Questions concerning the operation of a nuclear power plant as a nuclear cold reserve and the results of the periodical safety reviews | 17/6707 |
25 July 2011 | Research reactor BER-II | 17/6693 |
22 June 2011 | Draft of a 13th Act on amending the Atomic Energy Act | 17/6246 |
1 June 2011 | Origin of the uranium in German nuclear power plants | 17/6037 |
12 May 2011 | Known security deficits of German nuclear installations | 17/5808 |
29 April 2011 | Reportable events during the shutdown of nuclear power plants, especially with activated scram (pages 52 and the following) | 17/5675 |
26 April 2011 | Conclusions concerning civil protection from the nuclear accident in the Fukushima nuclear power plant | 17/5653 |
2010- | ||
28 October 2010 | Plenary meeting second and third consultation about the draft for amending the Atomic Energy Act | 17/68 |
27 October 2010 | Oral interpellations on the operational life-span extension during the plenary meeting (pages 7147 C and the following) | 17/67 |
22 October 2010 | Written answers to questions concerning the amendment of the Atomic Energy Act, additional electricity volumes for ISAR 2 and so on | 17/3364 |
21 October 2010 | Operational life span extension of nuclear power plants - questions concerning the 11th and 12th amendment of the Atomic Energy Act and the development funds agreement | 17/3395 |
21 October 2010 | Operational life span extension of nuclear power plants - questions on necessary retrofittings of the 17 nuclear power plants | 17/3394 |
20 October 2010 | Nuclear emergency - international liability law related to nuclear power plants | 17/3371 |
15 October 2010 | Malicious software "Stuxnet": German or European nuclear power plants affected? | 17/3308 |
28 September 2010 | Draft of a Nuclear Fuel Tax Act | 17/3054 |
28 September 2010 | Draft of a Twelfth Act on amending the Atomic Energy Act | 17/3052 |
28 September 2010 | Draft of an Eleventh Act on amending the Atomic Energy Act | 17/3051 |
27 September 2010 | Which findings does the federal government have on the degree of nuclear fuel enrichment in the fuel elements used in the 17 German nuclear power plants in the last years? (pages 62 to 63) | 17/3114 |
27 August 2010 | Costs that have accrued so far for the decommissioning, inclusion, dismantling, interim storage since the decommissioning of the AVR Jülich nuclear power plant (page 59) | 17/2818 |
25 August 2010 | Incidents in the French nuclear power plant Cattenom | 17/2807 |
26 July 2010 | Financial strains and budgetary risks resulting from the decommissioning and dismantling of nuclear reactors and the old radioactive waste stored in other countries | 17/2646 |
14 July 2010 | Biblis nuclear power plants - specific regulations | 17/2606 |
27 May 2010 | Accruals of the utilities for decommissioning and dismantling of nuclear power plants | 17/1866 |
2009- | ||
19 March 2009 | Debate on nuclear energy policy | 16/211 |
16 March 2009 | Expertise of the Federal Office for Radiation Protection | 16/12216 |
11 March 2009 | Tritium exposure of the river Mosel and other waters, from nuclear power plants in the Federal Republic of Germany | 16/12217 |
12 February 2009 | Shutdown of old nuclear power plants in Eastern Europe according to contracts (page 22212) | 16/205 |
13 January 2009 | Multilateralization of the fuel cycle | 16/11601 |
2008- | ||
11 July 2008 | Economic costs of nuclear energy | 16/10077 |
20 February 2008 | Statements of the Federal Office for Radiation Protection's president in the "Financial Times Germany" on electricity gaps from phasing out of nuclear energy (page 48) | 16/8311 |
29 January 2008 | Transferability of the results of the current study about childhood cancer in the vicinity of nuclear power plants to nuclear facilities in Karlsruhe, in particular the reprocessing plant | 16/8090 |
State of 2016.06.27